So, baring any kind of major disaster (or slow up in the process), one week from today we will be moved into the new house. I can't believe how much has been done in the last week. There is still a fair amount to go, but with everything that has gotten done, I have confidence that we will be in there. So exciting for our dream to finally come to fruition.
For now, enjoy some picks of the recent work.
fan up in Colten's room
master bath counter and lights
master shower is almost done
dishwasher installed
back porch light and fan
kitchen backsplash
front door waiting to be installed
cabinet hardware
kitchen countertop
Saturday, October 9, 2010
One week away?
Posted by Summer Dawn at 6:35 PM 0 comments
Sunday, October 3, 2010
Porches, propane and cleanup
This past week has brought a lot of changes. The porches are now poured (the posts will go in tomorrow), the propane tank is set and hooked up, and my husband and a coworker of his spent all day yesterday cleaning up the job site around the house so that they can start the dirt work this week in preparation for laying down sod.
This upcoming week, our master shower will be tiled, the granite countertops and kitchen backsplash will be installed, the exterior doors will be put on, door and cabinet hardware will be in, lights and sinks. By the end of this week, it should mostly look like a house that needs to be cleaned up in order to move in to. The shower glass won't be in until the next week, and then, October 16th, we will move in. It is so exciting! For now, enjoy some more pics.
propane tank
front porch
master bath tile waiting to be installed
floor tile in the master shower
master shower
south side yard after cleanup
back porch and pad for the a/c unit
front porch the day it was poured
And just because he's so DARN cute, a gratuitous pic of the bear
Love, Kevin, Summer and Colten
Posted by Summer Dawn at 6:43 AM 1 comments